48-hour site surveyFree consultation24/7 priority support

fire-safety-audit-bangladesh

Request Your Free Fire Safety Audit

[FORM — Above the fold]

  • Full Name *
  • Company Name *
  • Phone Number *
  • Building Type (Office / Hospital / Factory / Hotel / Residential / Other) *
  • Building Location *
  • Number of Floors
  • Current Fire Safety System (Installed / Partial / None / Unknown)
  • Message

[Book My Free Fire Safety Audit]

Our certified fire safety engineer will contact you within 4 business hours.


Why Fire Safety Compliance Cannot Wait

Bangladesh's FSCD (Fire Service & Civil Defence) is conducting increased inspections across commercial, industrial, and healthcare buildings.

The consequences of non-compliance are serious:

  • Fines and enforcement notices under the Fire Prevention Act
  • FSCD NOC withdrawal — making your building officially non-compliant for occupancy
  • Insurance voidance — your insurer can refuse to pay claims if fire systems were non-compliant
  • Criminal liability — building owners and managers can face prosecution after a fire incident
  • Export order suspension — for RMG factories, international buyers require fire safety compliance documentation

The Bangladesh National Building Code 2020 (BNBC 2020, Part 4) sets mandatory fire safety requirements for every commercial, industrial, and healthcare building in Bangladesh. Many buildings built before 2020 — and even some built after — do not comply.


What Our Free Fire Safety Audit Covers

SSAL's certified fire safety engineers conduct a comprehensive on-site audit against BNBC 2020 Part 4 and NFPA standards.

Audit Scope

Detection Systems

  • Type and coverage of smoke and heat detectors
  • Alarm panel type (addressable vs. conventional) and condition
  • Zone coverage against BNBC 2020 requirements
  • False alarm management and maintenance records

Suppression Systems

  • Sprinkler system type and coverage (where required by BNBC)
  • Clean agent suppression for server rooms and special hazard areas
  • Fire extinguisher types, placement, and service dates

Means of Egress

  • Emergency exit locations, width, and travel distances
  • Exit signage and emergency lighting condition
  • Fire door condition, self-closing mechanisms, and fire ratings

FSCD Compliance

  • Review of existing FSCD NOC (if any)
  • Assessment of readiness for NOC application or renewal
  • Identification of items that would cause NOC rejection

Written Audit Report You receive a written report listing all findings, risk ratings, and a prioritised remediation plan — regardless of whether you choose SSAL for the remediation work.


What Our Clients Say

"SSAL's audit found 23 deficiencies we were unaware of. They helped us prioritise and remediate everything within 8 weeks. We obtained our FSCD NOC first time."

— Building Manager, Commercial Office Tower, Motijheel

"After Rana Plaza, we took fire safety seriously but weren't sure if we were truly compliant. SSAL's audit gave us certainty. The report was detailed and actionable."

— HSE Manager, Garment Factory, Ashulia

"Our FSCD NOC was expiring and we didn't know what to do. SSAL managed the entire renewal process — audit, remediation, documentation, and FSCD submission."

— Facility Manager, Private Hospital, Dhaka


Common Fire Safety Deficiencies We Find

In our experience across hundreds of buildings in Bangladesh, these are the most common problems:

  1. Outdated or non-addressable fire alarm panels that do not meet current BNBC standards
  2. Insufficient smoke detector coverage (too few detectors, incorrect spacing)
  3. Blocked or locked emergency exits
  4. Fire doors propped open or damaged, breaking compartmentation
  5. Expired fire extinguishers or wrong type for the hazard class
  6. Missing or failed emergency lighting along evacuation routes
  7. No fire suppression in server rooms or generator areas
  8. Unsealed cable penetrations through fire-rated walls
  9. No maintenance records for FSCD inspection submission
  10. Expired FSCD NOC with no renewal plan

Any one of these can cause an FSCD inspection failure. Many buildings have several.


SSAL's Full Fire Safety Service

Beyond the free audit, SSAL provides the complete fire safety solution:

  • Remediation — supply and installation of compliant fire detection and suppression systems
  • FSCD NOC Application — we prepare your documentation and manage the FSCD submission process
  • BNBC 2020 Design — new-build fire safety design from concept to commissioning
  • Annual Maintenance Contract — quarterly testing, annual inspection, and FSCD renewal management

Brands we install: Bosch, Honeywell, Siemens Cerberus, Naffco, Apollo, Hochiki


Book Your Free Fire Safety Audit

The audit is completely free. The written report is yours to keep. There is no obligation to use SSAL for any remediation work.

[Book My Free Fire Safety Audit]

  • Phone/WhatsApp: +880-XXXX-XXXXXX
  • Email: info@smartsafety.com.bd
  • Hours: Sunday–Thursday, 09:00–18:00

Smart Safety & Automations Ltd. — Certified Fire Safety Engineers, Bangladesh

Next step

Ready to Get Started?

Free site visit and scoping call.

  • 48-hour site survey
  • Free consultation
  • 24/7 priority support